On-site HOCl cost worksheet for the EWCO 300: what to count for equipment, daily run time, water, additives, testing, labor, service and parts.

The short answer
The cost of on-site HOCl depends on your volume, the concentration you need, your local utility and labor rates, and the system you choose. We don't publish a cost-per-gallon or savings figure, because those depend on inputs only you have. Instead, this worksheet shows what to count and how to calculate it, using manufacturer specifications where they exist and your own numbers everywhere else. It is written around the EWCO 300 continuous system (up to 300 ppm). The same steps can be used for a batch machine such as the Eco One or Hypo 7.5, using that model's batch volume and cycle time.
Step 1: Define the job
- Daily volume needed (V, liters/day)
- Target concentration (ppm FAC), as your use's directions call for
- Operating days per year (D)
Concentration matters to cost because, for a continuous system, it changes how fast you can produce. In the EWCO 300 manual charts, the same additive and amperage give about 200 ppm at 1.5 L/min but about 100 ppm at 3.0 L/min (Formula 1, 22 A).
Step 2: Equipment (capital) cost
| Item | Source of number |
|---|---|
| System purchase price | Current quote or store price |
| Installation (plumbing, electrical, mounting) | Installer quote |
| Holding tank, float sensor, fittings, filtration | Quotes |
| Test equipment (strips, optional photometer/meter) | Quotes |
The EWCO 300 manual requires wall mounting and a ventilated location, and its warranty requires installation by a competent, qualified person and feed water hardness below 80 ppm. Water treatment to meet that is a potential cost if your supply is harder.
Annualized equipment cost = (purchase + installation + accessories) ÷ expected years of use. Expected years of use is your assumption; the sources reviewed don't state an EWCO 300 service life.
Step 3: Run time
For a continuous system at flow F (L/min):
Run time per day (min) = V ÷ F
Use the flow rate that delivers your target concentration under your additive and amperage settings, from the manual's chart, then verify with testing. Charts are a guide; the manual says actual performance varies with additive formulation, pump speed, and water quality.
For a batch system: batches per day = V ÷ batch volume, and run time = batches × cycle minutes at your concentration (from the manual), plus handling time in Step 6. The Eco One makes a 1-liter batch; the Hypo 7.5 makes a 7.5 L (2 gal.) batch at 200 or 500 ppm.
Step 4: Electricity
kWh per day = (power in kW) × (run time in hours)
Use the power figure in your manual, or measure actual consumption if you need precision. Don't rely on a rated figure alone if you need an exact cost.
Electricity cost per year = kWh/day × your rate ($/kWh) × D
Step 5: Water and additives
- Feed water per day ≈ V (liters produced), plus any water used for rinsing or flushing per your procedures. "Feed water" here is the EWCO 300 supply water.
- Water cost per year = feed water per day × your water rate × D. Include water-treatment costs if needed to meet hardness limits.
- Additive consumption: the manual gives additive formulas but does not state an additive consumption rate per liter produced, and the pump speed setting changes dosing. Measure how much additive your system uses at your settings over a known run time; until measured, leave this field "not entered".
- Additive cost per year = measured additive used per liter × V × D × cost per unit of additive ingredients (including food-grade salt).
Step 6: Testing and labor
- Testing supplies per year = tests per day × D × cost per test.
- Labor = (minutes per day for refills, testing, logging, and checks ÷ 60) × D × loaded hourly rate. The manual's maintenance checklist includes refilling additive, checking hose length and flow, spot-checking FAC, and inspecting the cord.
Step 7: Service and parts
The EWCO 300 warranty covers power adapters, printed circuit boards, and electrolysis cells for one year, and excludes wear-and-tear parts such as plumbing parts, solenoid valves, and pumps. Budget for:
- Water filters (the warranty lists routine filter replacement as an owner responsibility)
- Wear parts and out-of-warranty repairs
- Any service contract you choose
The sources reviewed don't give replacement intervals or prices for these; use quotes.
Step 8: Put it together
Annual operating cost = electricity + water + additives + testing + labor + service and parts
Annual total cost = annual operating cost + annualized equipment cost
Cost per liter = annual total cost ÷ (V × D)
To compare with what you buy now, calculate the same way: annual purchase cost of your current product at the use-dilution and volume you actually apply, plus its handling labor. Compare products only for uses each one's label or directions cover.
What this worksheet doesn't include
- Downtime, financing, taxes, or space costs, unless you add them.
- Any claim that on-site generation is cheaper. That depends on your inputs.
- Regulatory costs or requirements for your use. Confirm requirements for your setting.
How to size an EWCO 300
For EWCO 300 sizing, use this worksheet and the manual's charts, or email service@hocl.com. To compare models, see Eco One vs Hypo 7.5 vs EWCO 300 and Generator Sizing: Why ppm Changes Flow Rate and Tank Needs. For installation requirements, see EWCO 300: Production Rates and Installation Checklist.
The EWCO 300 is a continuous system that makes up to 300 ppm. For smaller batch volumes, see the Eco One (up to 500 ppm) or the Hypo 7.5 (200 or 500 ppm; 7.5 L / 2 gal. batch).
Blank worksheet
Download cost-input-worksheet.csv: every field has units, and every value starts as "not entered". No example figures are included.